电气工程师的英文简历模板
一份好的简历能够帮你更好的找到一份好工作,下面是小编为大家带来的电气工程师的英文简历,希望喜欢。
Name: | Mr. B | Nationality: | China (Mainland) |
Current Place: | Guangzhou | Height/Weight: | 174 cm 65 kg |
Marital Status: | married | Age: | 33 years |
Career Objective |
Application type: | Jobseeker | ||
Preferred job title: | Elecrical Engineer/Technician: electrical engineer 、 Mechatronics Engineer.: 、 Automation Control Engineer/Technician: | ||
Working life: | 8 | Title: | primary title |
Job type: | Full time | Expected Start date: | In a day |
Expected salary: | ¥8,000~¥9,999 | Preferred working place: | Guangzhou Foshan Shenzhen |
Work experience |
|
Educational Background |
Name of School: | wuhan univercity of technology and science | ||||||||||||
Highest Degree: | Bachelor | Date of Graduation: | 2005-07-01 | ||||||||||
Name of Major 1: | automation | Name of Major 2: | |||||||||||
Education experience: |
|
Language Ability |
Foreign Language: | English | Level: | perfect |
Chinese level: | perfect | Cantonese Level: | normal |
Relevant skills and abilities |
Personer ability 1.know well siemens S7300/400 programe,applying LAD\CFC\STL wonderfully. 2.be family with S7300/400 hardware configuration and profibus. 3.apply configuration software(e.g wondware of intouch). 4.know electrical control circuit,solve problem quickly. 5.know several transducer(e.g optical sensor/proximity swith/presure swith/presure transmitter/thomercouple) 6.understand electrical drawing. 7.maintaince equipment. |
Self-recommendation letter |
Open,actively. i have work in electrical for 8 years,i am available to responsible for industry company engineer position. project experience 1,2005, ** Company ,annually two million tons of steel production furnace installation,at first I am responsible for supervision basement lighting project, electrical panel mounted supervision, pull wiring supervision. Later I am responsible for profibus bus connection with foreign technicians, industrial ethernet connection, I / O check, cold tes. installation time spend three months, then one month for hot commissioning, after project complete, I am responsible for routine maintenance work. Main configuration device: 10kv transformer and high voltage control cabinet, ABB vacuum circuit breakers, low voltage control cabinet, S7-400 control PLC. (note:Due to confidentiality considerations, hidden some information) 2,2011, ** Company, five cold end solar glass production line, I am responsible for control cabinet installation, wiring supervision, personally responsible for the PLC basic program downloading, hardware configuration, profibus bus connection via Industrial Ethernet , I / O point test, and then follow the hot commissioning with foreign technicians, project time is four months. Additional four months stay in factory to help maintainance. Main configuration: S7-300PLC, ** inverter, encoder **, ** servo motors, software class intouch, winccflex, beckoff PLC. two same project for different cusotmer. (Due to confidentiality considerations, hidden some information) 3, 2012, Kuala Lumpur, Malaysia ,** company, hot end of a glass container handling system, I am responsible for the hot end conveyor equipment installation and commissioning, mechanical part and electrical workare done by myself only, project schedule is within two weeks, the main configurations: * * Drive ** servo motors, conveying equipment. 4 Similar projects. (Due to confidentiality considerations, hidden some information) |
小编精心推荐阅读
| | | |
小编精心推荐阅读
| | | |